VIDEOS/
INFORMATION

South-bridge-section-sq

PUBLIC MEETING VIDEOS

Virtual Public Informational Meeting #2 August 2022

Virtual Public Informational Meeting #1 March 2022

THE ROAD AHEAD WITH RTC

RTC Project Manager Judy Tortelli, P.E., talks about project developments. The video interviews are produced and broadcast by KOLO 8 News Now. You can also watch The Road Ahead with RTC news segments at the RTC YouTube channel.

REPORTS AND RECAPS

Current Design and Environmental Study

Agency Coordination Meetings
Feb 3, 2022 – Meeting #1 (Presentation, Kick-off Meeting Recap, Project Schedule)
July 11, 2022 – Meeting #2 (Presentation, Meeting Summary)

Design Review Committee Meetings
March 8, 2022 (Presentation)
April 12, 2022 (Presentation, Meeting Summary)
May 10, 2022 (Presentation, Meeting Summary)
July 19, 2022 (Presentation, Meeting Summary)
August 9, 2022 (Presentation, Meeting Summary)
September 13, 2022 (Presentation, Meeting Summary)
November 8, 2022 (Presentation, Meeting Summary)
December 13, 2022 (Presentation, Meeting Summary)
January 10, 2023 (Presentation, Meeting Summary)
February 14, 2023 (Presentation, Meeting Summary)
March 14, 2023 (Presentation, Meeting Summary)
April 11, 2023 (Presentation, Meeting Summary)
May 9, 2023 (Presentation, Meeting Summary)
June 13, 2023 (Presentation, Meeting Summary)

Aesthetic Stakeholder Working Group Meetings
February 25, 2022 (Presentation)
March 25, 2022 (Presentation, Meeting Summary)
May 6, 2022 (Presentation, Meeting Summary)
June 22, 2022 (Presentation)
Sepetmber 27, 2022 (Presentation, Meeting Summary)

RTC Board Meetings
June 17, 2022 (Meeting Summary)
November, 2022 (Meeting Summary)

Feasibility Study

Browse an archived library of information from the Feasibility Study Phase of the Arlington Avenue Bridges Project page in “Engineering & Construction” on the RTC website. Downloadable documents include:

• Final Feasibility Study Report and Appendices
• Map of the Project Area
• City of Reno TRAction Visioning Project Report and Appendices (2009)
• December 2019 Public Kick-off Meeting Recap
• Recaps of Stakeholder Working Group (SWG) meetings
• Recap of Technical Advisory Committee (TAC) meeting

PROJECT BACKGROUND

The Arlington Avenue Bridges Replacement Project is located in the City of Reno between Island Avenue and West First Street and includes the area of roadway through the three-acre, natural island Wingfield Park. The two, nearly century-old bridges have become structurally deficient because of their age and repeated exposure to flood events. The City of Reno owns the bridges, roadway, and Wingfield Park, which is accessible by the bridges.

The RTC, in cooperation with the City of Reno and other local and federal agencies, completed a feasibility and conceptual alternative analysis in June 2021. A Purpose and Need Statement (project level), consistent with goals in the RTC’s Regional Transportation Plan, was used as the basis for developing and screening alternatives. The four needs identified were 1) Respond to structural deficiencies of existing bridges; 2) Improve pedestrian, bicycle, transit, and traffic safety in the Wingfield Park area; 3) Provide sufficient river-flow capacity of the Truckee River during flood events; and 4) Respond to regional and community plans.

The feasibility study compiled and considered input from the public, stakeholders, and a technical advisory committee. The study resulted in preferred alternatives: a single-pier north bridge to replace the existing double-pier bridge, and a clear-span south bridge to replace the existing clear-span bridge. Stakeholders and the public endorsed a modern, art-deco theme for aesthetics as well.

The RTC will now complete the National Environmental Policy Act (NEPA) process required for federally funded projects. (Learn more from a Federal Highway Administration (FHWA) video on NEPA.) During the process, the RTC will collaborate with stakeholders and the public to evaluate ways to minimize or avoid adverse environmental effects.

Final design will be completed after this environmental review with in-river construction currently scheduled to begin July 1, 2025.